
{"id":2841,"date":"2017-12-15T23:55:29","date_gmt":"2017-12-15T23:55:29","guid":{"rendered":"http:\/\/blogs.plymouth.ac.uk\/dcss\/?p=2841"},"modified":"2017-12-15T23:55:29","modified_gmt":"2017-12-15T23:55:29","slug":"uss-michael-monsoor-suffers-a-breakdown","status":"publish","type":"post","link":"https:\/\/blogs.plymouth.ac.uk\/dcss\/2017\/12\/15\/uss-michael-monsoor-suffers-a-breakdown\/","title":{"rendered":"USS MICHAEL MONSOOR SUFFERS A BREAKDOWN"},"content":{"rendered":"<p><a href=\"http:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2842\" src=\"http:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-1024x662.jpg\" alt=\"\" width=\"560\" height=\"362\" srcset=\"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-1024x662.jpg 1024w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-300x194.jpg 300w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-768x497.jpg 768w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-560x362.jpg 560w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-260x168.jpg 260w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR-160x104.jpg 160w, https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-content\/uploads\/sites\/50\/2017\/12\/USS-MONSOOR.jpg 1600w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/a><\/p>\n<p>Sourced : Popular Mechanics<\/p>\n<p>By Kyle Mizokami<\/p>\n<p>The USS Michael Monsoor, the second and latest Zumwalt-class stealth destroyer, suffered an equipment failure that prevented the ship from conducting sea trials. The ship returned to the shipyard for a fix. The repairs are not expected to delay handover of the ship to the U.S. Navy in March.<\/p>\n<p>The Monsoor left Bath Iron Works shipyard in Maine on December 4th to conduct builder\u2019s trials. All ships conduct builder\u2019s trials, in order to test key systems before handing them over to their buyer. According to Reuters, \u201cMonsoor\u2019s problem was electrical in nature, with the loss of an induction coil causing the failure of another system. The shipbuilder decided it would be more efficient to make the fix at the yard.\u201d<\/p>\n<p>Read more at : http:\/\/www.popularmechanics.com\/military\/navy-ships\/a14408604\/the-us-navys-newest-stealth-destroyer-promptly-suffers-a-breakdown\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sourced : Popular Mechanics By Kyle Mizokami The USS Michael Monsoor, the second and latest Zumwalt-class stealth destroyer, suffered an equipment failure that prevented the ship from conducting sea trials. The ship returned to the shipyard for a fix. The repairs are not expected to delay handover of the ship to the U.S. Navy in&hellip; <a class=\"more-link\" href=\"https:\/\/blogs.plymouth.ac.uk\/dcss\/2017\/12\/15\/uss-michael-monsoor-suffers-a-breakdown\/\">Continue reading <span class=\"screen-reader-text\">USS MICHAEL MONSOOR SUFFERS A BREAKDOWN<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":2842,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[1734],"class_list":["post-2841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-defence-industry","tag-uss-michael-monsoor","entry"],"_links":{"self":[{"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/posts\/2841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/comments?post=2841"}],"version-history":[{"count":1,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/posts\/2841\/revisions"}],"predecessor-version":[{"id":2843,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/posts\/2841\/revisions\/2843"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/media\/2842"}],"wp:attachment":[{"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/media?parent=2841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/categories?post=2841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.plymouth.ac.uk\/dcss\/wp-json\/wp\/v2\/tags?post=2841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}